• Add description, images, menus and links to your mega menu

  • A column with no settings can be used as a spacer

  • Link to your collections, sales and even external links

  • Add up to five columns

  • Perun moto KTM 390 Adventure R or X / Enduro Top luggage rack - Installation Instructions

    Content of the kit

    • 2 x Side brackets (LHS and RHS)
    • 1 x Top luggage rack plate
    • 4 x 20/8.2-23 spacer
    • 2 x 20/8.2-8 spacer
    • 4 x M8x50 countersunk bolt
    • 2 x M8x30 countersunk bolt
    • 2 x M8 countersunk 3D washer
    • 6 x M6x20 countersunk bolt 
    • 6 x M6 flat washer
    • 6 x M6 safety nut

    Perun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - content of the kitPerun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - hardware pack

    ---

    Step-by-step video instructions.

    Coming soon

    ---

    I Installation of the rack
    II Installation of the Rotopax fuel can

    ---

    I Installation of the rack

    Required tools:

    • 4mm Allen key
    • 5mm Allen key
    • 6mm Allen key
    • 10mm wrench

      1. Remove OEM bolts from behind the seat.

      Perun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - installation instructions

      2. Remove two bolts shown below. Be careful not to lose the spacers which are held in place with these bolts. OEM spacers will be re-used later so keep them nearby. 

      Perun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - installation instructions 1Perun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - installation instructions 2Perun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - installation instructions 3

      3. Place two short spacers over the holes behind the seat.

      Perun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - installation instructions 4

      4. Insert two M8x50 (longest bolts from the kit) countersunk bolts into holes on the side bracket.

      Perun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - installation instructions 5

      5. Place one long spacer and one OEM spacer onto each of the bolts. See the photo below for proper orientation of the OEM spacer.

      Perun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - installation instructions 6

      6. Alling this assembly with the holes on side of the bike and thread both bolts by hand. Keep them lose for now.

      Perun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - installation instructions 7Perun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - installation instructions 8

      7. Use M8x30 countersunk bolt and M8 3D countersunk washer to secure rear end of the side bracket. Tighten by hand for now.

      Perun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - installation instructions 9

      8. Ensure that everything is seated correctly. Starting from the rear end, tighten all three M8 bolts to 18Nm.

      9. Repeat steps 2-8 on the other side of the bike. At this point both side brackets are mounted and all six M8 bolts are tightened to the specified torque.

      Perun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - installation instructions 10

      10. Carefully position the top plate over the side brackets. Alling three mounting holes on both parts and insert M6x20 countersunk bolts on both sides of the bike. Use flat washers and safety nuts on the inside to secure the assembly. Tighten by hand for now.

      Perun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - installation instructions 11Perun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - installation instructions 12

      11. Once everything liens up correctly, start tightening the M6 bolts to 6-7Nm. Tighten the front bolts on both sides first, then middle and rear ones.

      Perun moto KTM 390 Adventure R or X Enduro Top luggage rack Gen 2 - installation instructions 13

      12. After a couple of rides check all bolts and re-tighten if needed.

      ---

      II Installation of the Rotopax fuel can

      Coming soon